Modelled Abstraction Reductions - National Framework for Water Resources 2025
Spreadsheet showing modelled range of potential reductions to abstraction licence quantities that may be needed to meet environmental flow requirements for each water body in... - 
    
      
Water resource reliability
The Resource Reliability data indicates the percentage of time additional consumptive abstraction may be available and what this means for abstraction licensing. The Resource... - 
    
      
Water Resource Availability
The Water Resource Availability data is based on a nationally consistent method and provides a national picture of Water Resource Availability for each Water Framework Directive... - 
    
      
Water Resource Availability and Abstraction Reliability Cycle 2
This record is for Approval for Access (AfA) product AfA445. The Water Resource Availability and Abstraction Reliability Cycle 2 dataset indicates whether, and for what... - 
    
      
Technical assessment boundaries behind the abstraction licensing strategies Cycle 2
The technical assessment boundaries are used to define which water resource demands fall into each technical assessment. They are used to look at the balance between society,... - 
    
      
Surface Water Availability for Water Resource Charging
This is a national picture of Surface water resource availability mapped to Integrated Water bodies for the purposes of Water Resource Charging only. Water Resource charges will... - 
    
      
Source Protection Zones [Merged]
Source Protection Zones [Merged] have been created as public facing outlines where common boundaries and overlaps (based on zone number) have been removed. Source Protection... - 
    
      
Groundwater Management Units coloured according to water resource...
Shapefile of groundwater management units which are a break down of groundwater bodies used for local groundwater availability communication in Abstraction licensing strategies.... - 
    
      
Abstraction Licensing Strategy boundaries Cycle 2
The Abstraction Licensing Strategy Boundaries are an external reference dataset giving an indication of where technical assessments have been undertaken. The technical... - 
    
      
Water Resource Management Plan Supply-Demand Balance Forecast Collated Data
Water companies in England have a statutory duty to create, consult and publish a Water Resources Management Plan (WRMP) every five years. This dataset is a collation of the... - 
    
      
Water Resource Management Plan Annual Review Data
Water companies in England have a statutory duty to create, consult and publish a Water Resources Management Plan (WRMP) every five years. They are also legally required to... - 
    
      
WFD RBMP2 Risk Assessments - Transitional
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains transitional water bodies (estuaries) that are assessed to... - 
    
      
WFD RBMP2 Risk Assessments - Rivers
This dataset contains risk assessments produced to support the cycle 2 river basin management plans. It contains river water bodies that are assessed to be at risk of failing... - 
    
      
WFD RBMP2 Risk Assessments - Protected Areas
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains protected areas (Shellfish Waters and Bathing Waters) that... - 
    
      
WFD RBMP2 Risk Assessments - Lakes
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains lake water bodies that are assessed to be at risk of failing... - 
    
      
WFD RBMP2 Risk Assessments - Groundwaters
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains groundwater bodies that are assessed to be at risk of... - 
    
      
WFD RBMP2 NASS 2_3_06
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. The NASS (National Appraisal... - 
    
      
WFD RBMP2 Economic analysis 2015_Scenario 5_v1.7
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. The Scenario 5 dataset is based on... - 
    
      
WFD RBMP2 Economic analysis 2015_Scenario 3 and 4_v1.10
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. The Scenario 3 dataset considers... - 
    
      
WFD RBMP2 Economic analysis 2015_Scenario 2_v1.7
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. This dataset gives Scenario 2...